SUCCESS STORIES
RECEPTION AND FEEDING TURNKEY PLANT FOR SLABS
Peronda group has placed its trust in us for the realization of a turnkey project consisting of the production of slabs. The engineering project has undoubtedly been one of our greatest challenges to date, from the external reception of atomized clay, the distance to its storage and the versatility with the current installation, have required a very important effort from both our Engineering Department as our technical staff.
The project was completed with the conveying, storage and dosing of atomized dust in silos, as well as the automation of the entire installation to ensure a more efficient production.